ASSEMBLY OF MODEL A LONG BLOCK
1. The finish result can greatly be effected by the
quality and the cleanliness of assembly of engine.
2. Install preferably new oil pump drive gear in block
with spring.
3. Install valve cover with gasket and (10) 5/16x3/4 hex
bolts and lock washers. Gasket should be installed dry or
with a thin film of grease.
4. Install external oil pipe on side of block with 2
gaskets dry and (2) 5/16 bolts with copper or brass flat
washers.
5. Install (4) 7/16 bolts all the same length in the
corners of engine in stud holes top of block. Turn engine
upside down on the four bolts.
6. Install oil slinger on front of crankshaft up against
steel timing gear with lip out.
7. A. If using neoprene front seal, lubricate seal
lip and slide on pulley with sharp edge inward slide pulley on
crankshaft engage slot on key then push all the way on.
Secure pulley with ratchet nut.
B. If using original style
packing slide pulley on crankshaft engage slot on key then push
pulley all the on. Install packing in timing case cover.
Cut off excess flush with surface and lubricate packing.
8. Lubricate new spring and plunger and place in socket of
timing case cover spring first.
9. Install timing case cover and side cover with gaskets
dry and bolts. Run bolts in do not tighten.
10. Place oil pan rail gaskets (Dry) on pan rails.
Install cork rear pan gasket, may need trimming.
11. If using neoprene front seal cut pan rail gaskets to
fit around seal. Place small amount of RTV at joint of
seal and gasket.
12. If using front packing, place same in oil pan grove
trim if necessary and lubricate.
13. Prime rebuilt or new oil pump and place in block,
ensure shafts fit together and pump seats all the way in to
block.
14. Set oil pan into position and install (20) 5/16x3/4
hex bolts. Tighten two front first then two rear, tighten
all evenly.
15. Tighten timing cover and side cover bolts. This
method will help stop leaks.
16. Flywheel housing and clutch can now be installed.
Refer to flywheel aligning sheet.
17. Roll engine upright. Remove (4) 7/16 bolts in
top of block.
18. Install head studs. A small amount of RTV on
stud shoulder of course end will help stop seeping.
Position head gasket on block dry. Install head and stud
nuts torque to 50/ 55 pounds.
19. Install engine in vehicle. Complete installation
of ignition, include timing, manifolds, carburetor, starter,
generator, belts, hoses, etc.
20. Connect electrical wiring and cables fuel lines.
Add water, oil and gas.